The Scoping Study outlines an integrated development strategy for Halls Creek, with material from both deposits treated through a common processing plant at Onedin to recover copper, zinc and silver.

Key economic parameters reported on a 100% project basis

Flowsheet

Mineralised material from the Onedin open pit and Sandiego underground mine will be processed at a single heap leach facility to recover silver and copper as metal and zinc recovered as a zinc oxide product. The proposed development includes standalone heap pads for both the Onedin oxide and Sandiego sulphide ore material. Pregnant Leach Solution from both heaps will be collected in ponds and transferred to the process plant.

Silver is first recovered from the Pregnant Leach Solution through ion exchange and cementation circuits. The silver-depleted solution will then undergo solvent extraction and electrowinning to produce copper cathode. Zinc will subsequently be recovered by solvent extraction and further processed to produce zinc oxide. Following metal product recovery, the remaining raffinate will be recycled to the respective heaps for use in further leaching.

Previous
Previous

Project Highlights

Next
Next

Site Layout